Assessment of the technical condition of a facility
Find out the real condition of the building.
We assess the technical condition of an existing facility or part of it against the applicable normative and technical documents. Every non-conformity identified is reflected in the report.
- Accreditation certificate
- GAC-IB-0299
- Body type
- Type A
- Standard
- ISO/IEC 17020:2012/2013
- Valid
- until 10.07.2028
01 · Subject of inspection
What we inspect
We assess the conformity of the condition of an existing facility with the design documentation and/or against the established requirements, against the acts of concealed works, visual examination of the facility (including photographic records), against the results of measurements and surveys and with the conformity assessment documents.
| Part | Contents |
|---|---|
| Facility parameters | Key data on the facility inspected |
| Non-conformities | Description and supporting photographic material |
| Actual condition | A conclusion on the condition of the facility as at the time of the inspection |
| Measurement drawing | indicating any damage — where necessary |
| Laboratory testing | through subcontracted laboratories, including geodetic, geological and geophysical — where necessary |
| Calculations | Verification calculation of the stress-strain state and stability — where necessary |
02 · Result
What you receive
Inspection report
- the subject of inspection and the scope of services;
- the basis of assessment — which design, norms and requirements were applied;
- methods applied and inspection dates;
- Conformity assessment result — where this is provided for within the scope of services;
- non-conformities identified, with descriptions and evidence;
- limitations of the assessment — what was not inspected and for what reason;
- Certification by an authorised person.
03 · Process
How an inspection is carried out
01
Defining the criteria
We define the assessment criteria on the basis of the applicable requirements and agree the scope of services.
02
Documentary review
Review of the documentation submitted and comparison against the applicable requirements.
03
On-site inspection
Visual examination, measurements and photographic records. Where necessary, laboratory testing is commissioned.
04
Reporting
Documenting the findings, non-conformities and limitations, and delivering the report.
04 · Typical case
Assessment where stage protocols are missing
Construction is complete, but the stage documentation is incomplete?
Where the protocols for the construction stages have not been drawn up or properly executed, we survey the facility and assess the conformity of the works performed with the permit conditions — in order to prepare the expert conclusion required for commissioning.
- this assessment does not cancel the requirement for mandatory supervision.
- The scope of the survey and the possibility of issuing a conclusion depend on the condition of the facility and the evidence obtained.
- The decision on commissioning is taken by the authorised administrative body, not the inspection body.
Legal basis — the procedure approved by Resolution No. 255, Article 30, paragraph 5. Matsne ↗ For a specific facility, the conditions must be checked against the version currently in force.
05 · Scope and legal basis
What you should know
How this relates to the construction amnesty
Important: The result of an inspection is a documented assessment. The administrative decision — including commissioning — is taken by the authorised body, not by the inspection body.
Before publication, verify the current terms and deadlines of the regulation.
Scope of services
- The inspection result is based on the scope of assessment, the methods applied and the evidence collected.
- The company does not perform the works it independently inspects, nor does it take part in the design of the facility.
- Mandatory requirements are neither altered nor reduced by agreeing the scope of services.
- An inspection does not imply a predetermined favourable conclusion and provides no guarantee of an administrative decision.
06 · Related
Other services
The accreditation status of each service is defined by the annex to the scope of accreditation.
Normative documents and procedures TA-IP-18-20
- Construction norms and rules — SNiP, Part 1
- Construction norms and rules — SNiP, Part 2
- Construction norms and rules — SNiP, Part 3
- Technical regulations governing the construction sector in the territory of Georgia — №71 (2014)
- Technical regulation “On approval of national accessibility standards” — №732 (2020)
- Technical regulation — №41 (2016)
- TA-IP-18-20 — inspection methods and procedures
Source — scope of accreditation, certificate GAC-IB-0299 (updated 10.06.2026). View the scope (PDF) ↗
07 · Contact
Contact us
For the inspection of your facility — quality begins with the right decision.
Save time — submit your application online.
- Address
- Tbilisi, 14a Alexander
Kazbegi Avenue, 3rd floor - Phone
- +995 599 81 87 87
- [email protected]
- Legal name
- TIAG Auditescort LLC
- Identification code
- 205229439
- Accreditation certificate
- GAC-IB-0299